SCADA – Disinfection & Meter Improvements

Wayne County Rouge Valley Sewer District

Wayne County awarded a significant contract for SCADA, Disinfection & Meter Improvements for the Rouge Valley Sewer District & CSO to J. F. Cavanaugh. In turn, Cavanaugh selected Rotor Electric of Michigan, LLC to provide the necessary $2.6 million of electrical and electronic equipment and installation to complete the upgrades and improvements successfully. Construction teams completed the work over 17 months.

The North Huron Valley-Rouge Valley (NHV-RV) Sewer District serves most of Wayne County and a small portion of Oakland County. The district also currently accepts wastewater from the Western Townships Utility Authority (WTUA). The district covers 274 square miles, an estimated 55% of which is sewered.

The Lower Rouge subdistrict is served by an interceptor system that parallels the lower branches of the Rouge River. The Middle Rouge subdistrict is served by the Upper Rouge and Middle Rouge interceptors, which combine with Detroit’s Evergreen Sewer at Ford Road. There are several CSO and wet weather flow basins in the district and 48 regulators.

The SCADA, Disinfection & Meter Improvements for Rouge Valley & CSO project replaced outdated control system software and instrumentation at Lift Station 1A, the Livonia (Inkster Arm) Sanitary Equalization Basin, and at collection system remote facilities (including replacement of Doppler flow meters).

SCADA

The SCADA work performed by Rotor and its sister company Motor City Electric Technologies included:

  • PLCs – Upgrading the existing Allen-Bradley PLC-5s to the latest Allen-Bradley Control Logix automation platform at Lift Station 1A and the Dearborn Heights CSO RTB.
  • HMI – Upgrading the existing Wonderware HMI(Human Machine Interface) software to the latest GE iFIX.
  • Control System – Installing and configuring a state-of-the-art control system based on the Allen-Bradley Control Logix automation platform at the Livonia Basin.

Disinfection

The project also included rehabilitation and upgrade improvements to the disinfection, chemical feed, and other miscellaneous operations at the Dearborn Heights CSO RTB.

 

Meters

Also included in the project scope was upgrading selected flow meters and improvements to meters sites for the Rouge Valley Sewage Disposal System.

Subsidiary:

Motor City Electric Technologies, Rotor Electric

Client:

Wayne County

Location:

Detroit, Michigan

MORE PROJECTS

GLWA Wastewater Clarifier Facilities Rehabilitation

Milk River Drainage Improvement Project

Macomb County Connected Vehicle Infrastructure

Incinerator Sludge Feed Systems Facilities Renovation

FCA Data Centers

Biosolids Handling and Septage Receiving Facility

Ann Arbor Wastewater Treatment Plant

GLWA Aeration System Improvements

DWSD-Lake-Huron-water-treatment-plant

Lake Huron Water Treatment Plant

Ambassador Gateway

Ambassador Gateway Reconstruction

Detroit Incinerator project

GLWA Incinerator Facility Renovation

University of Michigan Data Centers

Interested in how we can save you money?

cog-gray.png